Member Login

News

16.10.2018 // VBB and RES group build 10 MW storage project in Bordesholm

Three months after start of construction, the topping-out ceremony for the 10 MW battery storage facility in Bordesholm was celebrated. As RES (Renewable Energy Systems Ltd) stated in a press release, the good collaboration between RES group and the regional utility VBB made a significant contribution to the smooth construction progress in reaching this important project milestone. The Lithium-ion storage system will provide grid stabilisation and back-up power fed from 100% renewable energy to the community when there is grid disruption or upstream grid failure.


The project is funded by Schleswig-Holstein's ministry for economy from EU funds.


Find more information at www.vb-bordesholm.de und www.res-group.com.

 

News

29.01.2019
Energy transition driven by LNG or hydrogen?

16.10.2018
VBB and RES group build 10 MW storage project in Bordesholm

04.10.2018
Argentina prepares 3rd renewables tender round

» Overview

Event calendar

10.09.2019
HUSUM Wind 2019

» Event overview

Contact

windcomm schleswig-holstein e.V.
Schloßstraße 7
25813 Husum
Germany

Phone: +49 (0)4841 6685-0
Fax: +49 (0)4841 6685-16

info@windcomm.de
Supported by: